Illustrative draft

See what a provisional GPU Decision Brief looks like.

This public sample is rendered from a provisional fictional sample Decision Record using captured Cloud Advisor and GPU Audit evidence. It shows the posture, facts, unknowns, risks, and verification plan without converting a tool result into a decision.

Download the sample PDF

This artifact is an illustrative sample, not a delivered Brief or a recommendation.

AIForge Works

Illustrative draft · provisional fictional sample

DRAFT · PROVISIONAL · FICTIONAL

GPU DECISION REVIEW

Illustrative Draft GPU Decision Brief

AWS 8 x H100 Inference Renewal Review. Rendered from a provisional fictional sample Decision Record using captured Cloud Advisor and GPU Audit evidence.
DECISION CONTEXT

Review the current AWS 8 x H100 path before the next inference commitment.

Northstar AI operates a continuously running 8 x NVIDIA H100 inference workload in Northern Virginia. The captured run uses the published AWS p5.48xlarge on-demand rate because no private paid rate was entered. GPU Audit applies 730 billed hours per GPU-month and the visible 12% idle or underutilized-time planning default. The company, owner, timing, and decision narrative are fictional; the captured inputs and product evidence are preserved.

Owner
Owner pending confirmation
Horizon
Next commitment decision within 60 days
Authority
Provisional / self-service sample
Evidence through
August 24, 2026
Next review
October 27, 2026
PROVISIONAL POSTURE

Keep AWS as the published baseline while validating alternatives before the next commitment.

DECISION BASIS

The AWS configuration and published price are traceable for the stated workload and operating scope. No lower exact-market, technically comparable, orderable alternative has been confirmed. The present evidence supports a verification cycle, not a provider switch.

Provisional · owner confirmation pending
DECISION SCOPE

The workload and commercial basis this draft covers.

Workload
Inference, 24/7
Quantity and GPU
8 x NVIDIA H100 on one instance
Minimum shape
176 vCPU and 960 GiB memory
Geography
Northern Virginia operating scope
Purchase basis
On-demand published catalog price
Planning inputs
730 h/GPU-month; 12% modeled idle time
CURRENT PATH AND ALTERNATIVES

What is retained, investigated, and unsupported.

Current path

RETAIN AS BASELINE

AWS p5.48xlarge in US East (N. Virginia), using the provider-published on-demand catalog rate. This is not the buyer's paid rate.

Broader-market signal

HELD FOR VERIFICATION

A $3.90 per GPU-hour Crusoe/global signal was captured outside the accepted exact-market comparison. Geography, terms, capacity, fees, and technical comparability remain unconfirmed.

Immediate provider switch

NOT SUPPORTABLE

The captured evidence does not establish a comparable offer, orderability, capacity, quote, workload performance, or migration case.

EVIDENCE AND ECONOMICS

Accepted facts, explicit models, and held signals stay separate.

The unresolved external-market signal is excluded from comparable alternative economics.

AWS published baseline

ACCEPTED PUBLISHED FACT$6.88 / GPU-hour

$55.04 per instance-hour and $482,150.40 annualized at 8 GPUs x 730 hours x 12 months. This is a catalog basis, not a paid rate.

Modeled idle exposure

EXPLICIT MODEL$57,858.05 / year

12% of the AWS published annual basis. This is planning math, not measured telemetry and not verified savings.

External-market signal

UNQUALIFIED · HELD$3.90 / GPU-hour

Captured as a broader/global signal only. It is not annualized, compared as an alternative, or used in the decision economics while exact-market review remains open.

FACT TREATMENT

The draft separates what is known from what cannot yet be claimed.

Confirmed facts

  • The captured query specifies an 8 x H100, 24/7 inference workload in the Northern Virginia operating scope.
  • AWS p5.48xlarge supplies 8 x H100, 192 vCPU, and 2,048 GiB in the captured catalog evidence.
  • The provider-published AWS on-demand basis is $55.04 per instance-hour, or $6.88 per GPU-hour.
  • The evidence package is dated through August 24, 2026; the captured run warns that some pricing rows were excluded.

Open confirmations

  • The buyer's actual paid rate, current term, renewal proposal, and reservation structure.
  • Exact-market mapping and like-for-like eligibility for the $3.90 external-market signal.
  • Provider orderability, capacity window, quote, deposit, minimum, and service commitments.
  • Measured utilization, workload performance, software stack, networking, storage, egress, support, and tax.

Excluded implications

  • No verified savings, comparable alternative annual cost, or actionable price gap is established.
  • No catalog entry proves availability, orderability, capacity, a live quote, or final paid rate.
  • No workload benchmark or telemetry establishes performance, utilization, migration feasibility, or fit.
  • No provider selection, customer confirmation, Decision Record seal, or monitoring activation has occurred.
RISKS AND VERIFICATION PLAN

Close the evidence gaps before commitment.

Commercial basis risk

The AWS benchmark may differ from the buyer's paid or proposed rate.

Comparability risk

The lower signal is outside the accepted exact-market comparison until geography and offer terms are proven.

Workload-fit risk

No benchmark or confirmed architecture-sensitive requirement proves that another configuration can run the workload.

  1. Confirm the buyer's current AWS paid rate, proposed term, minimums, and capacity commitment.
  2. Ask each provider whether the exact 8-GPU configuration is orderable for the required dates and geography.
  3. Collect networking, storage, egress, support, tax, deposit, and reservation terms outside compute.
  4. Confirm drivers, frameworks, interconnect, service commitments, and workload benchmark requirements.
RECHECK CONDITIONS AND REVIEW STATE

Proposed checkpoints, not active monitoring.

  • A verified, technically comparable offer becomes available in the required market.
  • AWS pricing, term, capacity, or service commitments materially change.
  • Measured idle or underutilized GPU time differs materially from the 12% planning assumption.
  • Workload size, duty cycle, GPU requirement, region, or performance constraints change.
PROVISIONAL · NOT REAFFIRMED

Next review: October 27, 2026

The recheck conditions are proposed for owner confirmation. They are not active monitoring triggers.

No monitoring is included in this illustrative draft. Any future monitoring would require separate confirmation, consent, and activation.

COMPACT EVIDENCE MANIFEST

The Brief renders dated evidence; it does not rerun the tools.

Cloud Advisor captured evidence

Workload-shape and AWS published-baseline evidence

Captured August 28, 2026 · Evidence through August 24, 2026

GPU Audit captured evidence

AWS annualization and explicit 12% planning model

Captured August 28, 2026 · Evidence through August 24, 2026

Crusoe/global catalog signal

Unqualified external-market signal held for verification

Captured August 28, 2026 · Evidence through August 24, 2026
ASSURANCE BOUNDARY

Evidence supports the record; it does not author the decision.

  • Cloud Advisor and GPU Audit provide dated evidence packages. They do not author, approve, or seal the decision.
  • This Brief performs no calculation or offer selection. It renders accepted facts and explicit unknowns from the provisional fictional sample Record.
  • This artifact is an illustrative sample, not a delivered Brief or a recommendation.
  • This fictional public sample contains no customer data. Customer decision data must remain protected inside the authenticated AIForge Works boundary and may not be externally processed or delivered without explicit authority.
Illustrative draft only. Northstar AI and its decision context are fictional. Captured tool evidence can support a provisional Decision Record only after governed ingestion and confirmation.

Catalog entries show publicly listed prices, not availability, orderability, capacity, live quotes, negotiated rates, workload performance, or savings. Findings remain separate and non-additive. Verify current terms, fees, geography, capacity, and technical requirements with each provider before acting.

Captured August 28, 2026 using pricing snapshot 2026-08-24T13:40:48Z. GPU Audit reported that some pricing rows were excluded. Exact-market mapping for the external signal remains under review.